Impact analysis

    Know which delivered systems a change affects, before you approve it.

    A supplier swaps a part, a customer asks for an upgrade, a requirement moves. Koddex follows the links from the change to every requirement, component and delivered system it reaches, so the change board decides with the full picture, not from memory.
    Simulated example: system, sites and numbers are fictitious.

    The three questions behind every change

    1. 1Which requirements, components and sub-components does it touch?
    2. 2Which systems already delivered are affected, and at which sites?
    3. 3Who has to review it before it goes out?
    Two engineers reviewing a change on screen

    Impact on installed units is still checked from memory.

    Today
    Searched. Guessed.
    • The impact is checked by hand, in spreadsheets and email threads
    • Nobody is sure which delivered units carry the old part
    • Two weeks of meetings for one change impact analysis
    • The customer finds the side effect on site
    With Koddex
    Computed. Traced.
    • The change follows the links: requirements, components, sub-components
    • Every delivered system it reaches, listed by site and revision
    • 1 day instead of 2 weeks at Exotec
    • Each decision kept with its reason and its approver
    From the field

    What engineering teams told us in demos.

    By hand
    impact analysis, high error margin
    « Analysing the impact of a requirement change is extremely manual, with a high margin of error. »
    PLM lead, large aerospace equipment maker
    « If I change the power supply, I have to change the test too. But I have to remember to. »
    Quality manager, medical device maker
    20 pages
    and a meeting for each change
    « A change means a twenty-page document and a meeting where we try to think of everything. »
    Executive, medical implant maker
    Heard in our demo meetings, 2026. Anonymised.
    AI agent

    The agent prepares. The engineer decides.

    It works within your permissions, on the data of the backbone, and every action is logged. Nothing goes out before an engineer approves it.
    app.koddex.io · AI agents
    AI change analystReady
    ECR-118 replaces gearmotor MR-40 with MR-45. What does it affect, down to installed systems?ECR-118 · Gearmotor MR-40 to MR-45Change request · in review
    1. Walk the backbonequeued
    2. Find requirements at riskqueued
    3. List installed systemsqueued
    1. ECR-118
    2. Gearmotor MR-40
    3. Lift module LM-2
    4. CPR-400 rev F
    1. REQ-03 Payload
    2. REQ-07 Cycle time
    3. SN-0412 · Lyon
    4. SN-0415 · Hamburg
    5. SN-0419 · Turin
    2
    assemblies
    2
    requirements
    1
    open project
    3
    installed systems
    Simulated example
    01

    See what a change touches, down to the sub-component.

    Select the change and Koddex returns every linked requirement, component, sub-component and test, upstream and downstream.
    02

    Know which customer sites to call, before anything ships.

    Every delivered system is in Koddex with its as-built configuration, so the impact list includes the units already installed, by site and revision.
    03

    Approve once, with the reason kept.

    The change request carries its impact list, its reviewers and its decision. Once approved, it becomes a new revision of each system it affects.
    Exotec

    Exotec runs its systems on Koddex, on three continents.

    Exotec, the French leader in robotic storage systems, designs, delivers and keeps its systems traced in Koddex, with its partners, across three continents.
    1,000+
    users in Koddex at Exotec
    20
    partner organisations working in the same backbone
    up to 30%
    of engineering time freed up
    2 weeks
    1 day
    for a change impact analysis, instead of 2 weeks
    Figures from Exotec. 1 day: measured after a year in use. We walk through the calculation on your perimeter during the demo.

    Frequently asked questions

    See all questions

    Yes. Each delivered system keeps its as-built configuration in Koddex, so the analysis lists the installed units a change reaches, with their site and revision.

    From the links in the backbone: requirements, components and delivered systems, loaded from your existing files and kept in sync with your CAD, PLM and ERP through the API.

    No. Koddex is the engineering backbone that sits with your CAD, PLM and ERP, not instead of them. It centralizes requirements, BOM, documents and every change on one graph, so each system you deploy stays traced, and it connects to PLM, QMS, ERP and MES platforms through its API.

    A Koddex deployment engineer sets up your first use case on site in under 3 days, and you see the value within two to three weeks, with a dedicated Customer Success Manager.

    Exclusively in the European Union, in the AWS Europe (Ireland) region. No customer data leaves the European Economic Area without your prior written agreement.

    Let's see what Koddex changes on one of your projects.

    Bring a project you just sold. 20 minutes, on an example close to your systems.