Every chart type, on your engineering graph.
Build any visualization you need. Each example below is a real chart that Koddex can compute from the metamodel — no BI extract, no data warehouse, no nightly ETL.
Requirements coverage over time
Track the % of requirements with passing verification, week by week. ISO 13485 design-control evidence built in.
Live · ISO 13485 · Insulin Pump v3.2
Defect density by subsystem
Stack-rank subsystems by defects per kLoC. Spot the joints that need attention before the next humanoid release.
Live · Wandercraft Atalante · Powertrain
Compliance readiness heatmap
Each AS9100 / DO-178C clause × each program. Green = covered, amber = gaps, red = blockers.
Live · AS9100D · DO-178C
Component reuse across programs
Flow diagram of components shared between products. Identifies cost savings and qualification reuse opportunities.
Live · Cross-program reuse · 4 lines
Baseline timeline
Show every baseline freeze, change request and qualification milestone on a single timeline. RCC-E ready.
Live · RCC-E · Reactor Coolant Pump
Change impact radar
When a requirement changes, see at a glance which subsystems are affected — components, tests, baselines, documents.
Live · Solar inverter 250 kW · grid converter change
Risk distribution
Severity distribution of ISO 14971 risk items by mitigation status. The 'open critical' slice that should never stay big.
Live · ISO 14971 · Risk file · 1,205 items
Subsystem health gauge
Composite KPI per subsystem — coverage × tests-passing × design-freeze maturity. Bullet gauges per LRU.
Live · Avionics LRU · Flight Control
Verification velocity
Stacked area of verification activities completed per week, by team. Spot bottlenecks before they become slippage.
Live · Bridge deck section A-4 · V&V
Traceability matrix density
Requirement → Test coverage as a 2D matrix. Click any cell to jump to the linked entity. DO-178C ready.
Live · DO-178C · SwReq → SwTest
Change request burndown
Open vs. closed CRs over the sprint. Forecast freeze date from current velocity.
Live · Exo-Skeleton v2 · Sprint 14
Geographic supplier map
Where each component is sourced. Filter by lead time, risk class, or compliance status.
Live · Solar inverter · 47 suppliers
Compliance readiness, at a glance.
ISO 13485, EU MDR, ISO 14971, AS9100, DO-178C, RCC-E, IEC 61513. Live heatmap showing which clauses have coverage, which evidence is missing, which baselines are signed. Audit-ready in one click.
ISO 13485 · Design Controls
94%
EU MDR · Annex II Technical Doc
81%
ISO 14971 · Risk Management
76%
AS9100D · Configuration Mgmt
68%
DO-178C · Software lifecycle
72%
RCC-E · Electrical equipment
88%
Export anywhere. With the audit trail.
PDF for auditors. Excel for program reviews. Webhooks for your BI. Every export ships with a cryptographic hash of the engineering state it was computed from.