Platform · Analytics

    The engineering metrics that actually move programs.

    Every chart type, every KPI, every dashboard — computed live on your Koddex graph. From requirements coverage to compliance heatmaps, across every market we serve.

    Every chart type, on your engineering graph.

    Build any visualization you need. Each example below is a real chart that Koddex can compute from the metamodel — no BI extract, no data warehouse, no nightly ETL.

    LineMedTech

    Requirements coverage over time

    Track the % of requirements with passing verification, week by week. ISO 13485 design-control evidence built in.

    Live · ISO 13485 · Insulin Pump v3.2

    BarRobotics

    Defect density by subsystem

    Stack-rank subsystems by defects per kLoC. Spot the joints that need attention before the next humanoid release.

    Live · Wandercraft Atalante · Powertrain

    HeatmapAerospace

    Compliance readiness heatmap

    Each AS9100 / DO-178C clause × each program. Green = covered, amber = gaps, red = blockers.

    Live · AS9100D · DO-178C

    SankeyManufacturing

    Component reuse across programs

    Flow diagram of components shared between products. Identifies cost savings and qualification reuse opportunities.

    Live · Cross-program reuse · 4 lines

    GanttNuclear

    Baseline timeline

    Show every baseline freeze, change request and qualification milestone on a single timeline. RCC-E ready.

    Live · RCC-E · Reactor Coolant Pump

    RadarEnergy

    Change impact radar

    When a requirement changes, see at a glance which subsystems are affected — components, tests, baselines, documents.

    Live · Solar inverter 250 kW · grid converter change

    PieMedTech

    Risk distribution

    Severity distribution of ISO 14971 risk items by mitigation status. The 'open critical' slice that should never stay big.

    Live · ISO 14971 · Risk file · 1,205 items

    74%GaugeAerospace

    Subsystem health gauge

    Composite KPI per subsystem — coverage × tests-passing × design-freeze maturity. Bullet gauges per LRU.

    Live · Avionics LRU · Flight Control

    AreaInfrastructure

    Verification velocity

    Stacked area of verification activities completed per week, by team. Spot bottlenecks before they become slippage.

    Live · Bridge deck section A-4 · V&V

    MatrixAerospace

    Traceability matrix density

    Requirement → Test coverage as a 2D matrix. Click any cell to jump to the linked entity. DO-178C ready.

    Live · DO-178C · SwReq → SwTest

    BurndownRobotics

    Change request burndown

    Open vs. closed CRs over the sprint. Forecast freeze date from current velocity.

    Live · Exo-Skeleton v2 · Sprint 14

    MapEnergy

    Geographic supplier map

    Where each component is sourced. Filter by lead time, risk class, or compliance status.

    Live · Solar inverter · 47 suppliers

    Compliance readiness, at a glance.

    ISO 13485, EU MDR, ISO 14971, AS9100, DO-178C, RCC-E, IEC 61513. Live heatmap showing which clauses have coverage, which evidence is missing, which baselines are signed. Audit-ready in one click.

    Compliance readiness · live
    • ISO 13485 · Design Controls

      94%

    • EU MDR · Annex II Technical Doc

      81%

    • ISO 14971 · Risk Management

      76%

    • AS9100D · Configuration Mgmt

      68%

    • DO-178C · Software lifecycle

      72%

    • RCC-E · Electrical equipment

      88%

    Export anywhere. With the audit trail.

    PDF for auditors. Excel for program reviews. Webhooks for your BI. Every export ships with a cryptographic hash of the engineering state it was computed from.

    See your engineering as numbers, not stories.

    Talk to us about what you'd want on your dashboard — we'll show you what Koddex can compute from your data.