Every chart type, every KPI, every dashboard, computed live on your Koddex graph. From requirements coverage to compliance heatmaps, across every market we serve.
Computes on your graph, with no BI extract in between
Every change to a requirement, a baseline, or a test run propagates to your dashboards in real time. No nightly batch jobs, no stale snapshots.
Engineering leads see coverage and defects. Program managers see milestones and risk. Quality sees compliance readiness. Everyone reads the same data, different lenses.
ISO 13485, EU MDR, ISO 14971, AS9100, DO-178C, RCC-E, IEC 61513. Live heatmap showing which clauses have coverage, which evidence is missing, which baselines are signed. Audit-ready in one click.
Lock and reviseBuild any visualization you need. Each example below is a real chart that Koddex can compute from the metamodel. No BI extract, no data warehouse, no nightly ETL.
Track the % of requirements with passing verification, week by week. ISO 13485 design-control evidence built in.
ISO 13485 · Insulin Pump v3.2Stack-rank subsystems by defects per kLoC. Spot the joints that need attention before the next humanoid release.
Wandercraft Atalante · PowertrainProbability × impact across program risks. Green = low, amber = medium, red = high, surfaced live from open issues, blockers, and overdue mitigations.
AS9100D · DO-178CFlow diagram of components shared between products. Identifies cost savings and qualification reuse opportunities.
Cross-program reuse · 4 linesShow every baseline freeze, change request and qualification milestone on a single timeline. RCC-E ready.
RCC-E · Reactor Coolant PumpWhen a requirement changes, see at a glance which subsystems are affected: components, tests, baselines, documents.
Solar inverter 250 kW · grid converter changeSeverity distribution of ISO 14971 risk items by mitigation status. The 'open critical' slice that should never stay big.
ISO 14971 · Risk file · 1,205 itemsComposite KPI per subsystem: coverage × tests-passing × design-freeze maturity. Bullet gauges per LRU.
Avionics LRU · Flight ControlStacked area of verification activities completed per week, by team. Spot bottlenecks before they become slippage.
Bridge deck section A-4 · V&VRequirement → Test coverage as a 2D matrix. Click any cell to jump to the linked entity. DO-178C ready.
DO-178C · SwReq → SwTestOpen vs. closed CRs over the sprint. Forecast freeze date from current velocity.
Exo-Skeleton v2 · Sprint 14Where each component is sourced. Filter by lead time, risk class, or compliance status.
Solar inverter · 47 suppliersMost engineering reporting is a person exporting spreadsheets on a Friday. Koddex computes the same numbers where the data already lives.
Charts are computed from the metamodel itself, so there is no pipeline to maintain between engineering and reporting.
A change to a requirement, a baseline or a test run reaches the dashboard as it happens, with no nightly job in between.
Every PDF, Excel or webhook payload ships with a cryptographic hash of the engineering state it was computed from.