For programme and configuration managers

See the real state of the programme.

Koddex shows each change with its effect on schedule and cost, and each review gate with its evidence. The status comes from the engineering data, so nobody rebuilds it in a meeting.

01

Today, the programme status comes out of a weekly meeting.

Today

Milestone tool
Change log
Configuration spreadsheet
Weekly meeting

Every week, project managers rebuild the real status by hand from the change log and the configuration spreadsheet.

With Koddex

Milestone tool
Change log
Configuration spreadsheet
Weekly meeting

Koddex computes the status from the engineering work itself. Each review gate is a baseline you can open and compare.

The review gate is ready before the meeting starts.

  • Open changes and late deliverables are counted from the engineering work, as it happens.
  • Each milestone is a frozen baseline you can compare with the previous one, item by item.
  • Approvals are signed on the items, so the gate evidence is already collected.
An engineer in a design office, drawings and a scale model behind him (illustration)
Gate CDR · baseline B3
  • Deliverables46 / 48
  • Open changes2 in review
  • ApprovalsSigned
1 day
for a change impact analysis, instead of 2 weeks of meetings and spreadsheets
02

What project management does in Koddex

Programme direction

The programme status on your home screen

The cockpit counts open changes and late deliverables as they happen, so nobody compiles them on Monday morning.

Configuration management

The configuration at any date

Each milestone is locked as a baseline. You can compare any two baselines item by item.

Reviews

Gates with the evidence attached

Approvals are signed directly on the items. When the review gate comes, the evidence is already collected.

Agents that take tasks off your team

Assign the preparation of a review gate to an agent. It compares the baselines, lists what is still open and assigns the remaining approvals. Every action is logged.

  • AI release engineer

    Compares two baselines and lists what is still open before a review gate.

  • AI engineering system assistant

    Answers questions across the whole project and prepares the impact analysis of the next change.

Example task

“What changed between the PDR and CDR baselines of the gripper?”

11 items changed: 4 parts revised, 3 requirements reworded, 4 tests added. 2 of the revised parts are not yet approved. Shall I list their approvers?

Within the user's rights · every action logged

Exotec designs automated logistics systems and robots on Koddex.

1,000+
users in Koddex
20
partner organisations in the model
Seconds
instead of days to identify a defect
EU
hosted, per-role and per-partner permissions

A 20-min demo. Your first use case live in 3 days.

Bring a design review that took a week to prepare. In the demo, we show how Koddex turns it into a frozen baseline.

We use cookies to keep the site running and to understand how it's used so we can improve it, like most sites do. Read the cookie policy