15
prototypes
“Show me the room-14 prototype, on the day of the test”
« Proving that the room-14 prototype was at that document level on the day of the test is computerised nowhere. »A test run is a dated fact, attached to one revision.
Use case · Quality & certification · Project management
Koddex records requirements, tests, results and deviations as the engineering work happens. The traceability your certifier expects is ready at any date, and you export only the scope each party needs.
1 click
to export the certification file
10 s
to find the right information, instead of 45 min across many tools
Measured at our reference customer after a year in use. Your first scope measures them on your own programme.
Watch it in 60 seconds
15
prototypes
« Proving that the room-14 prototype was at that document level on the day of the test is computerised nowhere. »A test run is a dated fact, attached to one revision.
2 000
units to build
« He was completely sure of himself — on a version of the standard that was true fifteen years ago. »The standard is a dated version in the model, not a memory.
5 / 30
engineers
« The administrative load of design control took five people for a team of twenty to thirty. »Evidence is a by-product of the work, not a second job.
Every change, test result and approval is recorded as the work happens, so the audit dossier is an export of existing data rather than weeks of collection.
Koddex keeps the history of every change, so you can show the configuration and its evidence as they were on the day a unit shipped.
The authority, the customer and each supplier receive only their part of the traceability, and the rest of your design data stays private.
01
Koddex logs who changed which value, when, and through which change request, directly on the item instead of in a separate tool.
02
Follow a requirement from the standard's clause to the system element, the test and its result.
03
Select a scope and a date, and the export contains the requirements, the evidence and the approvals behind them in one file.
03
It picks up the task in Koddex, works on your product data, comments on what it found and hands you the result to approve.
AI verification engineer
▸Prepare the evidence pack for the landing gear at the CDR baseline.
The CDR baseline holds 212 requirements: 198 have a passed test and 14 are still open. The pack is ready with the 14 open items listed first, and I commented each one for its owner. It waits for your approval before it goes to the quality team.
Every agent action logged · scoped to the user's permissions
No. Koddex sits with your CAD, PLM and ERP, not instead of them. It links what is already there on one graph and computes the effects of a change, and it connects to PLM, QMS, ERP and MES platforms through its API.
The first use case is typically live within 48 hours, and full onboarding takes about three weeks, led by a dedicated Customer Success Manager.
Exclusively in the European Union, in the AWS Europe (Ireland) region. No customer data leaves the European Economic Area without your prior written agreement.
Bring a recent audit request. In the demo, we show how Koddex exports the evidence an auditor asks for.
0-5 min
you describe the product and the change
5-15 min
we show the use case in Koddex on a product like yours
15-20 min
you leave with a plan for your first use case, live within a month