Customer story
Subcontractors in your graph, not your inbox
- 2
- build modes on one model
- 0
- PDF round trips per change

Advanced manufacturing
The EBOM, the MBOM, suppliers, routings and work instructions sit in the same model as the design. An engineering change reaches production on every site without anyone retyping it.
15 min
to assemble a complex product structure, instead of 2 to 3 days in Excel
1 day
for a change impact analysis, instead of 2 weeks of meetings and spreadsheets
Measured at our reference customer after a year in use. Your first scope measures them on your own programme. Reference customer: Exotec, with more than 1,000 users and 20 partner organisations in Koddex.
Today
The EBOM, the MBOM and the supplier files are three copies that drift apart, and every ECO is retyped downstream.
With Koddex
One product structure goes from design to production. Each ECO shows its effect on the MBOM and on each site before it is released.
The EBOM and the MBOM drift apart.
Both read the same items in Koddex, so a design change shows its effect on the MBOM before release.
Each ECO is re-entered by hand downstream.
In Koddex the ECO is an item with its computed impact. Production receives a task to act on instead of a PDF.
Subcontractors build to print from drawings sent by email.
Each supplier gets access to its own part of the model and nothing else.
Production ramps up on several sites at once.
Every site reads the same released configuration.
With Koddex agents
Assign an ECO to an agent. It checks what the change affects in the MBOM and on each site, and prepares the release for approval.
Teams that work with Koddex agents spend up to 50% less time on repetitive engineering tasks.
Customer story
Event
Booth E15, October 13 to 15. We run live demos on a real engineering project.
Bring one product and one ECO. In the demo, we show in Koddex how a change travels from the EBOM to the MBOM of each site.